A purchase order and an invoice move through one connection, with exceptions flagged automatically. The first pilots are live before the program is scaled.
Replaced a pile of customer procurement portals and manual PO checks with a single integration path, starting with a small pilot before scale.
Figures are illustrative; client details anonymized. A 24-hour reply is a target, not a result.
The situation
A purchase order and an invoice move through one connection, with exceptions flagged automatically. The first pilots are live before the program is scaled.
What I found
Customer portals were being checked by hand, across several systems. Price, address, and entity errors showed up as delayed orders.
What was in the way
Each large customer brought its own procurement path. The operation adapted one inbox at a time. There was no standard onboarding pattern.
What I did
A middleware path, a revised short account list, one first partner then small batches, and a minimum success line before anyone talks about scale.
Large industrial buyers bring their own procurement path. If the operation babysits each portal by hand, customers feel the delay and the team never has time for exceptions.
Summary
Staff were checking a long list of customer procurement portals by hand. The work was to choose one integration path, write a proof-of-concept rule, and define success as a short list of live connections — not a landscape diagram.
This is a customer-experience problem that looks like an IT problem. CX stayed in the room so the first connection would actually be usable.
The program was deliberately sequenced: finish a pilot, then add the next group of accounts.
Figures are illustrative; client details anonymized. A 24-hour reply is a target, not a result.
Illustrative
The first pilot runs on one integration path, not a new connection per account.
Illustrative
Purchase orders and confirmations move on that path instead of waiting on a manual check.
What “live” means before the next group of accounts is added.
First partner individually, then small batches.
Bring a problem
A short note is enough: what is breaking, what you have already tried, and what a good month would look like. If I am the wrong person, I will say so.